REC 34234 0452 319 235
myenergi Product Champion

EV charger installation in Pakenham and the South East

Zappi, Tesla or a charger of your choice. Single or three phase. Fixed price before we book — not after we've opened your switchboard.

Installation from $825 inc GST if you've bought the charger yourself. Supplied and installed, most jobs land between $1,500 and $2,600. Rough figures — the fixed price comes before we book, not after we've opened your switchboard.

Licensed REC 34234 Fully insured Pakenham based
myenergi Product Champion — SALTD Electrical is a certified myenergi Product Champion installer

Get a fixed price

Tell us three things and we'll come back with a real number, usually same day.

No call centre. Goes straight to us.

The numbers

What a charger install costs

Rough numbers so you can budget before anyone comes out. Both include GST, testing, commissioning and your Certificate of Electrical Safety.

From $825 inc GST

Installation only. You've already bought the charger — through the dealer, with the car, or online — and we do the rest.

  • Charger mounted where it suits the car, not where it suits us
  • Its own circuit and the right type of RCD at the board
  • Tested, commissioned and set up with the app
  • Certificate of Electrical Safety

Supplied and installed: $1,500 to $2,600

Charger and install together, inc GST. The bottom of that is a straightforward 7 kW unit. The top is a solar-matched myenergi Zappi, which charges the car off your export surplus instead of buying the power back. Three-phase and 22 kW units sit above it.

What takes it past the band

  • A switchboard upgrade, if the board can't carry a continuous load. Those start at $1,200 inc GST and we check first — often you don't need one
  • A long cable run, or a garage at the other end of the house from the board
  • Trenching to a detached garage, shed or carport
  • Going to three phase, where the car genuinely uses it

Rough figures off jobs we've done, not a quote, and a job with trenching or board work will go past the band. Tell us the car, where the board is and where you want the charger and you'll get a fixed price before anything is booked. No charge for that.

Three things decide your price

The charger on the wall is the easy part. We check all three before quoting.

Your switchboard

Older homes often have no spare ways or ceramic fuses. If the board can't carry a 7 kW continuous load, it needs upgrading, and you'll know that before you commit. Sometimes it's the consumer mains feeding the board rather than the board itself. The four checks that decide it — and why load management often means you don't need an upgrade at all.

Single or three phase

Single phase caps out near 7.4 kW. Three phase reaches 22 kW — but only if your car accepts it. We check your model first, because unused capacity is money burnt. If three phase does stack up, we do the upgrade as well.

Your solar

A standard charger pulls from the grid whether the sun's out or not. A Zappi charges from your surplus instead, so you're not buying back power you generated.

Thinking about a battery too?

Charger, solar and storage are one system. Treating them as three purchases costs more. Same switchboard, same install, usually cheaper done together.

Home batteries
What gets installed

Chargers we fit every week

As a myenergi Product Champion we get factory training on the Zappi range and direct technical support — so a solar-matched Zappi gets set up to actually follow your export.

  • myenergi Zappi: solar-matched charging
  • Tesla Wall Connector: tidy, properly run
  • 7 kW single phase: the standard overnight charge
  • 22 kW three phase: where the car justifies it
  • Switchboard upgrades: RCBOs, compliant main switch
  • Second circuits: for two-EV households

Have another charger in mind? We can install it. Brand doesn't matter — if it's a compliant charger sold in Australia, we'll fit it, wire it and commission it. Tell us what you've got or what you're looking at and we'll price the install around it.

myenergi Zappi EV charger installed with a tidy conduit run and isolator, by SALTD Electrical in Pakenham myenergi Product Champion
Zappi installed and commissioned — Pakenham
Tesla Wall Connector installed on a brick wall with a straight conduit run, by SALTD Electrical
Tesla Wall Connector, conduit run straight, cable coiled

Does your board need work first?

A charger is a continuous load. Plenty of boards around here can't carry one without work. We find that out at the quote, while the wall's still shut.

Switchboard upgraded with an individual RCBO per circuit, every way labelled, by SALTD Electrical
What a switchboard upgrade looks like — an RCBO per circuit, every way labelled

You get a fixed price covering the charger, the circuit and any board work, before we book the job. No provisional sums, no "we'll see what we find".

Why people book us

Local, licensed and accountable. You deal with the people doing the work.

myenergi Product Champion Licensed REC 34234 Fully insured Pakenham based Certificate of Electrical Safety supplied

Read our Google reviews →

EV questions we get every week

How much does an EV charger installation cost?

From $825 inc GST to install a charger you've bought yourself, which covers the circuit, the mounting, testing, commissioning and your Certificate of Electrical Safety. Supplied and installed, most jobs land between $1,500 and $2,600 inc GST — a straightforward 7 kW unit at the bottom, a solar-matched Zappi at the top. A job goes past that when the switchboard needs upgrading, the run to the garage is long, there's trenching involved or you're going to three phase. They're rough figures off jobs we've done; you get a fixed price before we book.

Do I need a switchboard upgrade for an EV charger?

Sometimes. The charger needs its own RCBO circuit and capacity for a sustained 32 A draw — newer homes usually cope, ceramic-fuse boards don't. We check before quoting, so the number we give you is the number you pay.

Can I charge my EV from my solar?

With the right charger, yes. A Zappi diverts your export surplus into the car rather than selling it back for a few cents — solar-only, grid-topped, or a blend. A standard charger can't do it.

Do I need three-phase power for an EV charger?

Usually not — most EVs sold here cap their onboard AC charger at 7.4 kW, so the extra capacity sits idle. It stacks up if your car takes 11 kW or more, you're charging two EVs, or three phase is already at the property.

How long does an EV charger install take?

Half a day for a straightforward 7 kW install with the board nearby. Long runs, detached garages or a switchboard upgrade make it a full day — we'll tell you which when we quote.

Can I just use the cable that came with the car?

For very low mileage, sometimes. But a 10 A granny lead adds 10–15 km of range an hour against 40 km+ from a wall charger, and running one nightly off a general outlet not designed for continuous load is a genuine fire risk.

Do you supply a Certificate of Electrical Safety?

Always. Prescribed work is independently inspected as well. Keep the certificate — your insurer will want it if you ever claim.

Already have solar and thinking about storage as well? A charger and a battery share the same switchboard work, so it's often cheaper to do both at once. See battery retrofit.

Where we work

Pakenham and Surrounds.

Core area, same or next day

Regular, usually within the week

  • Cranbourne
  • Clyde & Clyde North
  • Drouin
  • Warragul
  • Emerald & Cockatoo
  • Hallam

By arrangement

  • Dandenong
  • Frankston
  • Phillip Island

Get a real number before you commit

Send your suburb and what you're driving. Fixed price back, usually same day.